NoBadPicks

Movies Like Behind Schedule

If you loved Behind Schedule's Comedy storytelling, these films deliver a similar experience — carefully selected for tone, themes, and emotional depth. Each pick includes where to watch it right now.

Top Picks

Why Worry?
6.5

Why Worry?

1923

A hypochondriac vacations in the tropics for the fresh air - and finds himself in the middle of a revolution instead.

Tom Segura: Disgraceful
7.2

Tom Segura: Disgraceful

2018

Tom Segura gives voice to the sordid thoughts you'd never say out loud, with blunt musings on porn, parking lot power struggles, parenthood and more.

Jackass Presents: Bad Grandpa
6.1

Jackass Presents: Bad Grandpa

2013

86-year-old Irving Zisman is on a journey across America with the most unlikely companion: his 8 year-old grandson, Billy.

The Girl in the Café
7.0

The Girl in the Café

2005

Lawrence, an aging, lonely civil servant falls for Gina, an enigmatic young woman. When he takes her to the G8 Summit in Reykjavik, however, their bond is tested by Lawrence's professional obligations.

Almost Friends
6.3

Almost Friends

2017

A man in his mid-20s, still living at home with his mother and stepfather, puts all his eggs in one basket: the girl who works at his local coffee shop. The problem is, she has a serious boyfriend. As they become closer, the line between friendship and intimacy is blurred, and the situation forces both to examine where they are in their lives.

The Hangover Part III
6.2

The Hangover Part III

2013

This time, there's no wedding. No bachelor party. What could go wrong, right? But when the Wolfpack hits the road, all bets are off.

Babes
5.9

Babes

2024

After getting pregnant from a one-night stand, a single woman leans on her married best friend and mother of two to guide her through gestation and beyond.

Eddie Murphy Raw
7.3

Eddie Murphy Raw

1987

Eddie Murphy delights, shocks and entertains with dead-on celebrity impersonations, observations on '80s love, sex and marriage, a remembrance of Mom's hamburgers and much more.

More Movies Like Behind Schedule

The Air Up There
6.2

The Air Up There

1994

Jimmy Dolan is a college basketball coach who wants a big promotion. To get it, he needs to make a dramatic find. He ends up deep in Africa, hoping to recruit Saleh, a huge basketball prodigy Jimmy glimpsed in a home movie. But Saleh is the chief's son and has responsibilities at home, since the tribe's land is threatened by a mining company with its own hotshot basketball team.

Small Apartments
5.8

Small Apartments

2012

When a clumsy deadbeat accidentally kills his landlord, he must do everything in his power to hide the body, only to find that the distractions of lust, the death of his beloved brother, and a crew of misfit characters force him on a journey where a fortune awaits him.

Thunderstruck
6.1

Thunderstruck

2012

After NBA star Kevin Durant switches talent with 16 year old Brian, the teenager becomes the star of his high school team, but Durant starts struggling and eventually learns an important lesson.

Much Ado About Nothing
6.8

Much Ado About Nothing

2013

A modern retelling of Shakespeare's classic comedy about two pairs of lovers with different takes on romance and a way with words.

Gabriel Iglesias: I'm Sorry for What I Said When I Was Hungry
7.0

Gabriel Iglesias: I'm Sorry for What I Said When I Was Hungry

2016

Hawaiian-shirt enthusiast Gabriel "Fluffy" Iglesias finds the laughs in racist gift baskets, Prius-driving cops and all-female taco trucks.

The Secret Life of Walter Mitty
7.2

The Secret Life of Walter Mitty

2013

A timid magazine photo manager who lives life vicariously through daydreams embarks on a true-life adventure when a negative goes missing.

Dave Chappelle: The Unstoppable...
6.7

Dave Chappelle: The Unstoppable...

2025

Facing a world gone sideways, comedy icon Dave Chappelle delivers bold truths and potent punchlines in this no-holds-barred special.

The Wrong Guy
6.8

The Wrong Guy

1997

Nelson Hibbert expects to become the new president of Nagel Industries, but Mr. Nagel gives the promotion to another employee. When Nelson barges into Nagel's office to confront him, he finds Nagel's been murdered. Fearing that he will be implicated, Nelson decides to run from the law...despite the fact that the police already know the killer's identity.

Find Me Falling
6.6

Find Me Falling

2024

After a failed comeback album, a rock star retreats to a cliffside home on Cyprus, only to find his new life complicated by visitors — and an old flame.

Room Service
6.5

Room Service

1938

Broke Gordon Miller tries to land a backer for his new play while he has to deal with with the hotel manager trying to evict him and his cast.

29th Street
7.0

29th Street

1991

After winning $6.2 million in the 1976 New York State Lottery, he is arrested for throwing rocks at a church. He then tells his story at the police station.

Cop Secret
6.0

Cop Secret

2022

When Bússi, Iceland's toughest cop, is forced to work with a new partner to solve a series of bank robberies, the pressure to close the case as soon as possible proves too much for him.

Why These Movies Are Similar

These recommendations share core qualities with Behind Schedule (1993): Comedy themes, similar narrative structure, and comparable emotional depth. NoBadPicks uses a combination of TMDB collaborative filtering, genre matching, and AI analysis to surface films most likely to resonate with fans of Behind Schedule.

See full details for Behind Schedule (1993)

People Also Search For